Research on measurement planning method in equipment development
CSTR:
Author:
Affiliation:

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Aiming at the measurement planning problems caused by the huge parameter system and long measurement chain in the equipment development process, the general methods of establishing measurement models, designing measurement schemes and evaluating measurement results are analyzed, and the basic ideas to solve the measurement problems in equipment development are proposed, which provides a reference for the formation of universal, procedural and standardized measurement solutions.

    Reference
    Related
    Cited by
Get Citation
Related Videos

Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: January 17,2023
  • Published:
Article QR Code