Discussion on the Whole Relocation Work of Calibration Laboratory
CSTR:
Author:
Affiliation:

AECC Guizhou Liyang Aero Engine Co., Ltd

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    This paper starts with the planning and design of a new calibration laboratory and the preparation and implementation of the overall relocation work, and puts forward the design ideas for water, electricity, gas, nets and other facilities and the layout of the experimental room, and the recommendations for the implementation of the relocation work and laboratory restoration, to ensure the overall relocation of the laboratory is carried out smoothly.

    Reference
    Related
    Cited by
Get Citation
Related Videos

Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: January 10,2018
  • Published:
Article QR Code