    摘要:

    延迟时间是拖锥系统的重要技术指标,为实现拖锥系统管路延迟时间的精准预测,本文基于连续性方程和动量守恒方程对拖锥系统进行理论建模,同时考虑不同流动状态管路中粘性阻力的影响,模型的适用性得到改善,同时通过试验验证了模型的准确性,使模型更具备实际工程应用性。在此基础上,研究了管路自身结构参数和环境参数对拖锥系统延迟时间的影响,随着管路长度和环境背压的增大管路延迟时间增大,随着管路直径、阶跃压力和环境温度的增大管路延迟时间降低。

    Abstract:

    Delay time is an important technical indicator of trailing cone system. In order to accurately predict the pipeline delay time of trailing cone system, a theoretical model of the trailing cone system was established based on the continuity equation and the momentum conservation equation with the influence of viscous resistance in pipelines under different flow states taken into consideration at the same time. The applicability of the model was improved and the accuracy of the model was verified by experiments, which makes the model applicable to practical engineering use. Moreover, the influence of the pipeline structural parameters and environmental parameters on the time delay of the trailing cone system was studied. The results show that the pipeline delay time increases with the increase of pipeline length and environmental pressure, and decreases with the increase of pipeline diameter, step pressure and environmental temperature.

    参考文献
    相似文献
    引证文献
引用本文

姜延欢*,吴娅辉,杨军,刘渊,谢兴娟,田森.拖锥系统管路延迟时间分析研究[J].计测技术,2022,(1)::
10.11823/j. issn.1674-5795.2022.01.08.

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期: 2022-04-13
  • 出版日期:
文章二维码